Transmission
Grid Selection:
North South 400kV Interconnection
Abstract:
EirGrid and SONI (System Operator for Northern Ireland) are jointly proposing a new high capacity electricity interconnector between the electricity networks of Ireland and Northern Ireland. Currently there is only a single such interconnector between the two networks and a second interconnector is now proposed.
Period: 2002
Organisations: EirGrid
GridWest
Abstract:
The Grid West project will deliver 21st century energy infrastructure to the west of Ireland.
Period: 2012
Organisations: EirGrid
GridLink
Abstract:
The Grid Link Project is an estimated €500 million investment in the national electricity grid linking Leinster and Munster. The project consists of a new high voltage overhead power line linking Knockraha in Co. Cork to Great Island in Co. Wexford to Dunstown, near Kilcullen, in Co. Kildare ensuring a reliable and high quality electricity supply for homes, farms and businesses in the south and east region for the future.
Period: 2012
Organisations: EirGrid
Clashavoon Dunmanway
Abstract:
A new 110 kV electricity circuit is proposed to connect Clashavoon electricity substation, which is located north east of Macroom Co. Cork, and Dunmanway electricity substation located on the outskirts of Dunmanway Co. Cork.
Period: 2012
Organisations: EirGrid
Donegal 110kV
Abstract:
The Donegal 110kV project is being jointly developed by ESB Networks and EirGrid, as it consists of both a transmission and a distribution line.
Period: 2009
Organisations: EirGrid, ESB Networks
Dublin North Fringe
Abstract:
Dublin North Fringe 220kV infrastructure.
Period: 2012
Organisations: EirGrid
East West Interconnector
Abstract:
The East West Interconnector links the electricity transmission grids of Ireland and Great Britain and at 500 MW is the largest voltage sourced conversion High Voltage Direct Current scheme currently in operation in the world today.
Period: 2010
Organisations: EirGrid
East Kerry North West Cork
Abstract:
EirGrid is proposing a new 220/110 kV substation which will connect into the existing 220 kV transmission line which runs from Tarbert, Co. Kerry to Clashavoon, Co. Cork, a new 110 kV circuit will be required to connect the proposed new 220/110 kV substation to the planned Cordal 110 kV substation and a new 110 kV circuit will be required to connect the proposed new 220/110 kV substation to either the planned Knockacummer 110 kV substation or the existing Glenlara 110 kV substation.
Period: 2012
Organisations: EirGrid
Laois Kilkenny
Abstract:
EirGrid is proposing to reinforce the network in the general Laois-Kilkenny region by way of constructing a new circuit between the two counties.
Period: 2009
Organisations: EirGrid
You are viewing page 1 of 2